Forms and Publications

Enter all or part of a document title, description or number:     

Browse By Subject  |  Most Requested  |  Required L&I Workplace Posters  |  Spanish Language Documents  |  Show all L&I Forms/Pubs


Results for: field
View:    Sort by:       
Title/Description:

Keyword search within results:  
Type:

Field Operations-Regional Boundaries and Office Information

Fact sheet: Shows which L&I region serves which counties and the location of offices. Side Two lists the address and telephone number for each office.



Publication
F101-100-000
 
Shop and Field Inspection Report
Used by L&I inspectors when they inspect boilers.

Form
F620-027-000
 
Safety Standards for Logging Operations WAC 296-54

This chapter establishes safety practices for all types of logging, log road construction and other forest activities using logging machinery and/or power saws regardless of the end use of the wood. This includes; logging, cutting and transporting timber, cutting timber, log harvesting logging, pulpwood logging camps, rails, rough wood, manufacturing, stump removing in the field, timber piling, timber pole cutting, tree chipping in the field, wood chipping in the field. In addition, logging and personal protective equipment, hand and portable powered tools, falling and bucking, tree pulling, mechanized falling, climbing equipment, rigging, spars, wire rope and various types of cable logging systems, guylines, tail/lift trees and anchors, yarding, skidding, landing, transportation of logs and stationary trailer loaders, log unloading, booms, and rafting grounds, transportation crews, signals and signal systems.



Manual
F414-016-000
 
Safety Standards Lockout/Tagout WAC 296-803

Lockout/Tagout applies to the service and maintenance of machines and equipment, including piping systems, if employees could be injured by the unexpected energization or start up of the machine or equipment or release of stored energy. Energy sources include mechanical, hydraulic, pneumatic, chemical, thermal, or other energy, including gravity. Machines and equipment include those that produce high intensity electromagnetic fields.



Manual
F414-124-000
 
Pre-Inspection Checklist for Hot Water Heating or Hot Water Supply Boilers
Checklist which reflects the most common violations encountered by Field Inspectors. This checklist should be gone through prior to requesting inspection of Hot Water Heating or Hot Water Supply Boilers

Form
F620-050-000
 
Pre-Inspection Checklist for Potable Water Heaters - ASME "HLW" Stamped Water Heaters
Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of Potable Water Heaters-HLW

Form
F620-051-000
 
Pre-Inspection Checklist for Low Pressure Steam Boilers

Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of Low Pressure Steam Boilers



Form
F620-052-000
 
Pre-Inspection Checklist for High Pressure Boilers

Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of High Pressure Boilers



Form
F620-053-000
 
Factory Assembled Structures Alteration Application

Used by a homeowner or contactor to request a field inspection for an alteration to a manufactured or mobile home.



Form
F622-036-000
 
Roof Affidavit and Structural Inspection Request

The purpose of the manufactured home roof affidavit is to provide timely inspections and communications between the contractor and/or owner and FAS inspectors and field staff.

A structural inspection request questionnaire will not be required when a roof change out occurs if no structural changes are made in the roof sub-surface and roof cavity. Example: Repairing or replacing the roof trusses, rafters, ridge beam and the replacement of not more than (4) 4’x 8’ of roof sheathing.



Form
F622-076-000
 
Your Daily Record of Hours and Units Worked - For Agricultural Workers / Spanish - Su Registro Diario de Horas y Unidades Trabajadas - Para Trabajadores Agrícolas

Booklet: A pocket-sized bilingual guide to encourage agricultural workers to keep track of their daily work hours, units and earnings.



Publication
F700-169-909
 
How To Calculate Your Wage in Agriculture

Fact/Information sheet: Shows piece rate workers how to calculate their wages to check if they are being paid minimum wage.



Publication
F700-171-000

Alt Language(s):
Español
 





End of main content, page footer follows.

Access Washington official state portal

© Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington.