Rules Under Development

Electrical safety standards, administration, and installation

Chapter 296-46B, WAC

Electrical Safety Standards

The purpose of this rule adoption is to amend language in WAC 296-46B-920, pertaining to scope of work requirements for load bank testing and preventative maintenance. This rule adoption will amend the 07-scope of work requirements for electrical licensing to allow 07-level nonresidential maintenance specialty contractors and electricians the ability to perform installation and connections of temporary electrical conductors and equipment for the purpose of load testing. Currently, the rule requires this type of work to be performed by a 01-general electrical contractor, using 01-general journey level electricians.

11/4/2013

PDF: Adoption (Rule-Making Order CR-103)

PDF: Adopted Rule Language

10/14/2013

Public Hearing

10/14/2013

Comments Due

9/3/2013

PDF: Proposed Rulemaking (CR 102)

PDF: Proposed Rule Language

5/21/2013

PDF: Preproposal (CR-101)

End of main content, page footer follows.

Access Washington official state portal

© Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington.