Obtenga un formulario o publicación

Escriba todo el título del documento o una parte, la descripción o el número:     

Formularios más populares  |  Carteles requeridos del lugar de trabajo  |  Formularios y publicaciones en español


Resultados para: Stop Work
Vea:    Ordenar por:       
Título/Descripción:

Búsqueda de palabras clave:  
Tipo:

Chapter 19.28 RCW - Electricians and Electrical Installations

Simplified version of the Chapter 19.28 RCW - Electricians and Electrical Installations Rules



Manual
F500-039-111
 
Electrical Safety Standards,Administration, and Installation WAC 296-46B

Electrical Safety Standards,Administration, and Installation WAC 296-46B



Manual
F500-039-222
 
Electrical Installation Variance Application

To apply for a variance which is an allowable deviation from specific requirements of a National Electrical Code section, or the WAC 296-46B where the proposed alternate methods will maintain equivalent safety.



Formulario
F500-063-000
 
Green Power Generation System Installation: What You Should Know Before Doing Any Electrical Work
Fact sheet: Explains that an electrical permit and inspection are required for most new, remodel, and maintenance electrical work. Provides information specific to the installation of green power generation systems.

Publicación
F500-116-000
 
HB 2253 Open Window Opportunity - Affidavit of Hours of Unsupervised Telecommunications Installation Experience

This form is not available until June 12.



Formulario
F500-127-000
 
Boiler / Pressure Vessel Water Heater Installation or Reinstallation Permit
This form is filled out by the installer, contractor and/or owner who wants to install or reinstall a boiler.

Formulario
F620-032-000
 
Construction Elevator Installation Application and Inspection Data Report

Used by companies to apply for an Construction Elevator (Hoist) at a job site. One application per car and companies need to contact the Elevator Section for the appropriate installation and operating fee.

Allow two weeks for a response. Accuracy and completeness speeds up the processing time.



Formulario
F621-001-000
 
Installation Application for Elevators

Used for installation application for elevators (new, renewals, and alterations).

Allow 30 business days for a response. Accuracy and completeness speeds up the processing time.
 
Residential Incline Chair Lifts: Allow one week for a response.



Formulario
F621-005-000
 
Elevator Installation Variance Application

Property owner or elevator company can apply for a variance to install an elevator. 4 pages.

Allow 4-6 weeks for a response.  Accuracy and completeness speeds up the processing time.



Formulario
F621-048-000
 
Conveyance Installation Approval by Building Official

Used by the installer to notify L&I that a conveyance is proposed for installation in a building.



Formulario
F621-056-000
 
New Elevator Installation Checklist

Checklist for the elevator company/contractor to complete before the call L&I for an elevator inspection. Includes December 2010 letter on ASME checklists.



Formulario
F621-057-000
 
Affidavit of Continuity Medical Gas Installation

Affidavit of Continuity



Formulario
F627-043-000
 
Questions and Answers about Electrical Safety
Fact Sheet: Answers questions about training and certification/licensing requirements for those who perform electrical installations, and electrical work that requires a permit and inspection.

Publicación
F500-110-000
 
Stop Work Payroll Report

Stop Work Payroll Report



Formulario
F262-043-000
 
Payment of Wages - RCW 49.48.010 and 49.52.050

This is a copy of the law that pretains to the payment of wages to an employee when they stop working for an employer. The wages due to the employee for the pay period worked prior to leaving.



Formulario
F700-064-000
 





End of main content, page footer follows.

Access Washington en Español

© Depto. de Labor e Industrias del Estado de Washington. El uso de éste sitio del Internet está sujeto a las leyes del Estado de Washington.