Obtenga un formulario o publicación: abatement

Su búsqueda de "abatement" consiguió 3 resultados.

Título Tipo Número

Q&A: Stay of Abatement Date


Fact sheet: Explains how an employer requests a "stay of abatement date." Effective July 1, 2012, an employer must fix a hazard cited in a workplace inspection during appeal unless he or she has requested and been granted a stay of abatement date.

Publication F417-235-000

Safety Standards for Administrative Rules WAC 296-900


Administrative Rules and the DOSH Administrative Manual affords employers the right to administrative and judicial review of alleged violations, initial penalties and abatement periods.

Manual F414-136-000
Asbestos Abatement Project Notice of Intent and L&I DOSH Asbestos Program

Notice is not required for any asbestos project involving less than forty-eight (48) square feet of surface area, or less than ten (10) linear feet of pipe unless the surface area of the pipe is greater than forty-eight (48) square feet. Get instructions to complete the form.

Form F413-025-000

No consiguió resultados para "abatement."

End of main content, page footer follows.

Access Washington en Español

© Depto. de Labor e Industrias del Estado de Washington. El uso de éste sitio del Internet está sujeto a las leyes del Estado de Washington.