Obtenga un formulario o publicación

Escriba todo el título del documento o una parte, la descripción o el número:     

Formularios más populares  |  Carteles requeridos del lugar de trabajo  |  Formularios y publicaciones en español


Resultados para: permits
Vea:    Ordenar por:       
Título/Descripción:

Búsqueda de palabras clave:  
Tipo:

An Annual Electrical Permits Saves Time and Money. Would it Work for You?

Flier: Describes when facility operators/owners qualify for an annual electrical permit.



Publicación
F500-123-000
 
Application to Establish an Factory Assembled Structure Deposit Account with the Dept. of Labor and Industries

Use to establish a factory assembled structure (FAS) deposit account. FAS deposit accounts are for businesses or other entities that are not currently licensed or registered with L&I as electrical or construction contractors but are legally required to purchase work permits from L&I. (3 pgs)



Formulario
F120-116-000
 
Application to Access L&I's Electrical Permit and Inspection System (EPIS) from SecureAccess Washington and Utilize Contractor Deposit Account via the Internet
To establish a contractor deposit account by an electrical contactor or registered construction contractors who are legally required to purchase electrical work permits from L&I.

Formulario
F500-055-000
 
Electrical Work on Residential Property: What You Should Know Before Work Begins
Fact Sheet: Explains to property owners the importance of electrical permits, inspections and approvals. An electrical permit is required for most new, remodel and maintenance electrical work.

Publicación
F500-078-000
 
Electrical Work on Commercial Property: What You Should Know Before Work Begins
Fact Sheet: Explains to commercial property owners the importance of electrical permits, inspections and approvals. An electrical permit is required for most new, remodel and maintenance electrical work.

Publicación
F500-109-000
 
Before Electrical Sign Work Begins: What Electrical Sign Contractors and Electricians Should Know
Fact Sheet: Explains work that is allowed and not allowed under (04) Sign Scope of Work and what electrical sign contractors and electricians should know before doing sign work. Also covers electrical Class B labels and electrical permits, inspections and fees.

Publicación
F500-111-000
 
Electrical Safety Tips for Your Home: Protect Your Family and Your Property
Pamphlet/Booklet: Provides information to help consumers properly handle electrical equipment and appliances, know the required permits and inspections for electrical work, and verify licenses and certifications before having electrical work performed.

Publicación
F500-115-000
 
Teens at Work: Facts for Employers, Parents and Teens

Pamphlet/booklet: Answers questions employers, parents and teens may have about employing teen workers (ages 14-17). Explains non-agriculture work rules, including the necessary permits, hours and work conditions. Provides links to other resources.



Publicación
F700-022-000

Otro(s) idioma(s):
Español
 
Teens at Work: Facts for Employers, Parents and Teens /Adolescentes en el trabajo (Spanish)

Pamphlet/booklet: Answers questions employers, parents and teens may have about employing teen workers (ages 14-17). Explains non-agriculture work rules, including the necessary permits, hours and work conditions. Provides links to other resources.



Publicación
F700-022-999

Otro(s) idioma(s):
Inglés
 
Young Workers in Agriculture/Trabajadores jóvenes en la agricultura (English/Spanish)

Pamphlet/booklet: Answers many questions employers and minor workers have about employing minors. Covers agriculture work rules, including the necessary permits, hours and work conditions for workers 12-17 years of age.



Publicación
F700-096-909
 
Account Deposit for Contractor's or Miscellaneous Account Holder's

Used to deposit money into your L&I account (Electrical).



Formulario
F500-080-000
 
Elevator Installation Variance Application

Property owner or elevator company can apply for a variance to install an elevator. 4 pages.

Allow 4-6 weeks for a response.  Accuracy and completeness speeds up the processing time.



Formulario
F621-048-000
 
Elevator Five-Year Safety Test Report

This report is used by elevator company mechanics and left on the job site for review by elevator inspectors.



Formulario
F621-051-000
 
Hydraulic Overpressure Test

To be submitted when a valve is changed or a seal is broken.



Formulario
F621-052-000
 
Test of Escalator Safety Devices

A licensed elevator mechanic shall perform this test once a year and mail a copy to L&I.



Formulario
F621-055-000
 
Conveyance Installation Approval by Building Official

Used by the installer to notify L&I that a conveyance is proposed for installation in a building.



Formulario
F621-056-000
 
New Elevator Installation Checklist

Checklist for the elevator company/contractor to complete before the call L&I for an elevator inspection. Includes December 2010 letter on ASME checklists.



Formulario
F621-057-000
 
Licensed Elevator Contractor (LC) Operation

Contractors who install, construct, repair, alter or maintain elevators need to be licensed by the Elevator Program through L&I and with L&I's contractor registration program.



Formulario
F621-069-000
 
Renewal of Elevator Mechanic License

Used by elevator mechanics to renew their license if they do not want to use the online "Get or Renew a License".



Formulario
F621-080-000
 
Renewal of Contractor Elevator License

Used by Elevator Companies to renew their Contractor License.



Formulario
F621-082-000
 
Construction Elevator Installation Application and Inspection Data Report

Used by companies to apply for an Construction Elevator (Hoist) at a job site. One application per car and companies need to contact the Elevator Section for the appropriate installation and operating fee.

Allow two weeks for a response. Accuracy and completeness speeds up the processing time.



Formulario
F621-001-000
 
Installation Application for Elevators

Used for installation application for elevators (new, renewals, and alterations).

Allow 30 business days for a response. Accuracy and completeness speeds up the processing time.
 
Residential Incline Chair Lifts: Allow one week for a response.



Formulario
F621-005-000
 





End of main content, page footer follows.

Access Washington en Español

© Depto. de Labor e Industrias del Estado de Washington. El uso de éste sitio del Internet está sujeto a las leyes del Estado de Washington.