Continuing education is required for renewal

Installer certification is valid for three years. Certified installers must attend a continuing education course to qualify for certification renewal. Certified installers must complete their required continuing education and the renewal application process prior to expiration of their certificate.

Continuing education classes available

Manufactured/Mobile Home Installer Continuing Education Schedule
(All classes will be held at the local Labor & Industries office)

Class Dates Location Class Times Registration Cut-off Date
March 19, 2013 Moses Lake 8 a.m. – noon March 15, 2013
March 20, 2013 Kennewick 8 a.m. – noon March 15, 2013
March 21, 2013 Spokane - DSHS Building 8517 E. Trent Ave. 8 a.m. – noon March 15, 2013
April 9, 2013 Mt Vernon 8 a.m. – noon April 5, 2013
May 14, 2013 Tumwater 8 a.m. – noon May 10, 2013
June 18, 2013 Moses Lake 8 a.m. – noon June 14, 2013
June 19, 2013 Yakima 8 a.m. – noon June 14, 2013
July 16, 2013 Mt Vernon 8 a.m. – noon July 12, 2013


For more information:

RCW 43.22 Sections 335-495 - Manufactured/mobile homes, factory-assembled structures. (apps.leg.wa.gov)
RCW 43.22A - Mobile and Manufactured Home Installation. (apps.leg.wa.gov)
WAC 296-150I - Manufactured Home Installer Training and Certification Program, Installation Code. (apps.leg.wa.gov)
WAC 296-150M - WA Manufactured Home Code. (apps.leg.wa.gov)

 Get Help Downloading Files (files open in a new window).