Schedule of Surveys
Survey Schedule for July 2006 - June 2012
This page was last updated in March 2012.
Group 1
| Number of surveys mailed: 11,000 | Questionnaires: N/A |
| Survey mailing date: 10-02-2006 | Due date: 12-31-2006 |
| Survey period: 07-01-2005 Through 6-30-2006 | Publication date: 08-01-2007 |
| Trade Name (as Defined in WAC) | WAC |
Last Survey Start Date |
Last Survey Finish Date |
|---|---|---|---|
| Playground and Park Equipment Installers | |||
| Remote Controlled Cleaning, Inspection and Sealing of Underground Sewer and Water Systems | |||
| Inland Boatmen | 10-06-1989 |
||
| Metal Fabricators In-Shop | 11-12-1992 |
||
| Landscape Construction | 04-30-1996 |
||
| Water Well Drillers, Exploration Drillers, Water | 08-15-1997 |
||
| Roofers | 09-05-1997 |
||
| Elevator Constructors | 08-01-2000 |
||
| Sign Makers and Sign Installers - Electric | 08-01-2000 |
||
| Sign Makers and Sign Installers - Non electric | 08-01-2000 |
Group 2
| Number of surveys mailed: 18,303 | Questionnaires: N/A |
| Survey mailing date: 03-26-2007 | Due date: 06-30-2007 |
| Survey period: 01-01-2006 Through 12-31-2006 | Publication date: 02-01-2010 |
| Trade Name (as Defined in WAC) | WAC |
Last Survey Start Date |
Last Survey Finish Date |
|---|---|---|---|
| Electrical Fixture Maintenance Workers | 11-08-2000 |
07-15-2001 |
|
| *Inside Wireman Electricians | 11-08-2000 |
07-15-2001 |
|
| Ironworkers | 11-30-2000 |
07-15-2001 |
|
| Carpet and Resilient Floor Layer | 03-01-2002 |
06-21-2002 |
|
| Drywall Finishers (tapers) | 03-01-2002 |
06-21-2002 |
|
| Glaziers | 03-01-2002 |
06-21-2002 |
|
| Marble Setters | 03-01-2002 |
06-21-2002 |
|
| Brick Masons | 08-29-2002 |
12-15-2002 |
|
| Stone Masons | 08-29-2002 |
12-15-2002 |
|
| Terrazzo Workers' Helpers, Tile and Marble | 03-01-2002 |
06-21-2002 |
|
| Terrazzo (artificial marble) Workers | 03-01-2002 |
06-21-2002 |
|
| Tile Setters | 03-01-2002 |
06-21-2002 |
|
| Traffic Control Stripers | 03-01-2002 |
06-21-2002 |
* The results of this survey were unpublished due to confusion caused by the instructions and form. Inside Wireman Electricians were re-surveyed in Group 5.
Group 3
| Number of surveys mailed: 28,522 | Questionnaires: N/A |
| Survey mailing date: 11-28-2007 | Due date: 03-02-2008 |
| Survey period: 07-01-2006 Through 06-30-2007 | Publication date: 02-01-2010 |
| Trade Name (as Defined in WAC) | WAC |
Last Survey Start Date |
Last Survey Finish Date |
|---|---|---|---|
| Painters | 03-01-2002 |
06-21-2002 |
|
| Boilermakers | 09-30-2002 |
01-06-2003 |
|
| Heat and Frost Insulators and Asbestos Workers | 09-30-2002 |
01-06-2003 |
|
| Heating Equipment Mechanics | 09-30-2002 |
01-06-2003 |
|
| Metal Fabricators In Shop | 11-12-1992 |
||
| Plumbers, Pipefitters, and Steamfitters | 09-30-2002 |
01-06-2003 |
|
| Refrigeration Mechanic | 09-30-2002 |
01-06-2003 |
|
| Roofers | 09-05-1997 |
||
| Sheet Metal Workers | 09-30-2002 |
01-06-2003 |
|
| Sprinkler Fitters | 09-30-2002 |
01-06-2003 |
Group 4
| Number of surveys mailed: 31,045 | Questionnaires: N/A |
| Survey mailing date: 04-26-2008 | Due date: 07-30-2008 |
| Survey period: 01-01-2007 Through 12-31-2007 | Publication date: 02-01-2010 |
| Trade Name (as Defined in WAC) | WAC |
Last Survey Start Date |
Last Survey Finish Date |
|---|---|---|---|
| Certified Asbestos Abatement Workers | 08-01-2000 |
||
| Carpenter Tenders | 03-26-2001 |
01-11-2002 |
|
| Clean-up Laborers | 03-26-2001 |
01-11-2002 |
|
| Fence Erectors and Fence Laborers | 03-26-2001 |
01-11-2002 |
|
| Flaggers | 03-26-2001 |
01-11-2002 |
|
| Hod Carrier, Mason Tenders, and Mortarmen | 03-26-2001 |
01-11-2002 |
|
| *Laborers in Utilities Construction | 03-26-2001 |
01-11-2002 |
|
| Laborers | 03-26-2001 |
01-11-2002 |
* Laborers in Utilities Construction results were unpublished pending the outcome of a request for removal of the WAC.
Group 5
| Number of surveys mailed: 30,377 | Questionnaires: N/A |
| Survey mailing date: 03-26-2009 | Due date: 06-30-2009 |
| Survey period: 01-01-2008 Through 12-31-2008 | Publication date: 08-02-2010* |
| Trade Name (as Defined in WAC) | WAC |
Last Survey Start Date |
Last Survey Finish Date |
|---|---|---|---|
| Cabinet Makers | 05-16-2002 |
07-05-2002 |
|
| Carpenters | 03-26-2001 |
01-11-2002 |
|
| Drywall Applicators (drywall nailers and sheetrock installers) | 03-26-2001 |
01-11-2002 |
|
| Inside Wireman Electricians | 11-08-2000 |
07-15-2001 |
|
| Insulation Applicators | 03-26-2001 |
01-11-2002 |
|
| Lathers | 03-26-2001 |
01-11-2002 |
|
| Millwrights | 03-26-2001 |
01-11-2002 |
|
| Construction Site Surveyors | 10-06-1989 |
||
| Pile Drivers | 03-26-2001 |
01-11-2002 |
* Construction Site Surveyors were published 10-15-2010 and became effective 11-14-2010.
Stand Alone Survey
| Number of surveys mailed: 118 | Questionnaires (Estimated): 691 |
| Survey mailing date: 04-02-2012 | Due date: 06-30-2012 |
| Survey period: 01-01-2010 Through 12-31-2011 | Publication date: TBD |
| Trade Name (as Defined in WAC) | WAC |
Last Survey Start Date |
Last Survey Finish Date |
|---|---|---|---|
| Ready Mix Truck Drivers | N/A |
11-30-2001 |
01-11-2002 |
Group 6
| Number of surveys mailed: TBD | Questionnaires (Estimated): 14,000 |
| Survey mailing date: TBD | Due date: TBD |
| Survey period: TBD | Publication date: TBD |
| Trade Name (as Defined in WAC) | WAC |
Last Survey Start Date |
Last Survey Finish Date |
|---|---|---|---|
| Divers & Tenders | N/A |
03-12-2001 |
07-15-2001 |
| Dredge Workers | N/A |
03-26-2001 |
01-11-2002 |
| Industrial Engine & Machine Mechanic | N-A |
||
| Operating Engineers (equipment operators) | 03-26-2001 |
01-11-2002 |
|
| Ship Building & Ship Repair | N/A |
11-08-1996 |
|
| Modular Buildings | N/A |
||
| Truck Drivers | N/A |
11-30-2001 |
01-11-2002 |
| Utilities Construction (underground sewers and water lines) | 03-26-2001 |
01-11-2002 |
Group 7
| Number of surveys mailed: TBD | Questionnaires (Estimated): 14,000 |
| Survey mailing date: TBD | Due date: TBD |
| Survey period: TBD | Publication date: TBD |
| Trade Name (as Defined in WAC) | WAC |
Last Survey Start Date |
Last Survey Finish Date |
|---|---|---|---|
| Building Service Employees (janitors, waxers, and window washers) | 08-01-2000 |
||
| Cement Masons | 08-29-2002 |
12-15-2002 |
|
| Electricians - Motor Shop | N/A |
||
| Electronic Technician | 11-22-2004 |
04-15-2005 |
|
| Fabricated In Shop Pre cast Concrete | N/A |
08-29-2002 |
12-15-2002 |
| Industrial Power Vacuum | N/A |
||
| Outside Telephone Line Construction | 11-22-2004 |
04-15-2005 |
|
| Plasterers | 08-29-2002 |
12-15-2002 |
|
| Power Line Construction Electricians | 11-22-2004 |
04-15-2005 |
|
| Power Line Clearance Tree Trimming | 11-22-2004 |
04-15-2005 |
|
| Solar Controls (Tint and Coating Installer) | 03-01-2002 |
06-21-2002 |
|
| Stage Rigging Mechanics | |||
| Street and Parking Lot Cleaning-Sweepers | 08-01-2000 |
||
| Telecommunication Technicians | 11-22-2004 |
04-15-2005 |
If you have questions, please contact Nathan Peppin in the Prevailing Wage Program at 360-902-5304 or Nathan.Peppin@Lni.wa.gov.