Last updated: Nov. 20, 2026

On this page:

Overview

On May 26, 2026, a massive chemical storage tank ruptured at the Nippon Dynawave Packaging Co. mill in Longview, killing 11 workers and injuring 12 others. It is one of the deadliest industrial disasters in modern Washington state history.

Our hearts are with the workers who lost their lives, their families, those who were injured, and the entire Longview community.

On Nov. 20, 2026, the Washington State Department of Labor & Industries (L&I) announced the results of its 6-month investigation, citing the company for 75 workplace safety and health violations and issuing $9,177,127 in penalties.

A summary of L&I's citations and penalties and an overview of the investigation provide more details about the violations.

It's by far the largest workplace safety and health fine in Washington State history. The violations include "willful serious" and "egregious willful serious" violations, the most severe classifications under workplace safety laws.

L&I determines workplace safety and health fines based on the type and severity of the violation.

The exhaustive investigation included interviews with more than 70 witnesses. Investigators also reviewed more than 40,000 documents.

L&I's investigation found that Nippon Dynawave knew the walls of the tank involved in this tragedy were dangerously thin months before the rupture, but continued operating it without making repairs or taking other steps to protect workers.

Investigators also found serious safety problems involving other chemical storage tanks at the facility, along with failures in the company's emergency planning, training, and response.

Nippon Dynawave has 15 working days after receiving the citation to appeal L&I's findings and penalties. There are additional L&I investigations involving the facility in Longview that remain ongoing.

Money collected from L&I workplace safety and health fines goes into the state's workers' compensation supplemental pension fund, which supports benefits for injured workers and families of people who died on the job.

The Washington State Department of Ecology has separately investigated the environmental impacts of the tank rupture and issued penalties related to the release of chemicals and the emergency response.

Information About the Tragedy

Just after 7 a.m. on Tuesday, May 26, a chemical storage tank ruptured at Nippon Dynawave Packaging Co. in Longview.

The tank held approximately 900,000 gallons of white liquor, a chemical mixture commonly used at paper mills to break down wood into pulp.

The tank failure caused a massive release of liquid, killing 11 workers and injuring 12 others.

L&I opened a workplace safety and health investigation that same day.

Family and Worker Support

Nippon Dynawave is part of the state workers' compensation system managed by L&I. We provided resources to the Family Support Center set up at the Association of Western Pulp & Paper Workers Hall in Longview, and we're working to support families out of our Kelso office.

Response and Investigation

L&I immediately opened a workplace safety and health investigation. Our goal was to determine what happened, identify any workplace safety violations, and help prevent similar incidents from happening in the future.

Our investigative team was on-site for weeks, starting on May 26. That includes specialized investigators who focused on high-hazard chemical industries.

As part of the investigation, we gathered relevant documentation, including safety plans and hazard assessments. Our inspectors interviewed witnesses and conducted a thorough physical inspection of the site.

Information about safety and health investigations for all employers, including Nippon Dynawave Packaging Co., can be found on L&I's Verify a Contractor, Tradesperson or Business web page.

L&I Inspections Related to Nippon Dynawave

Here's a historical list of L&I inspections of Nippon Dynawave listed by L&I division or program.

SAFETY & HEALTH

This is an overview of L&I's safety and health regulatory actions since Nippon Dynawave purchased the Longview facility in 2016.

For definitions of violations, details about penalties, and explanations of the complaint process, go to L&I Safety & Health Compliance History at Nippon Dynawave or review Washington's law on criminal penalties for workplace safety violations.

Regulatory history

  • Issued Jan. 29, 2018: In response to a referral (report from a non-employee). No violations found.
    • Report of a crane being used to slow down a 38-ton reel of paper because the machine intended to slow it down was not working.
  • Issued Dec. 6, 2018: In response to a referral. No violations found on inspection.
    • A worker was injured when a machine started unexpectedly, dropping a roll of paper and breaking his leg. 
  • Issued Feb. 12, 2020: In response to a worker complaint. One Serious violation, $700 fine.
    • Two workers were directed to enter a press to clean. Machine was not “locked out” to prevent the possibility of the machine turning on unintentionally.
  • Issued June 11, 2021 (view inspection results): One Serious violation, $2,700 fine.
    • Workers were not wearing required face coverings (COVID-era regulations) and there was no screening in place for workers. 
  • Issued Dec. 30, 2021 (view inspection results): In response to employer report of hospitalized worker. One Serious violation, $700 fine.
    • Inspection triggered by report of an outbreak of 10 COVID cases in 28 days. While there, inspector saw a worker on an unprotected platform about 5 feet off the ground, without fall protection.
  • Issued June 24, 2025 (view inspection results): In response to an employer report. One General violation, no fine.
    • Equipment involved in an employee finger amputation was moved before inspection and release by L&I.
  • Issued Aug. 24, 2026 (view inspection results): In response to a complaint about a tank that had a broken valve. One General violation and one Serious violation, $2890 fine.
    • Prior to L&I's inspection, the company took the tank offline and repaired it.
  • Issued Oct. 28, 2026 (view inspection results): In response to a complaint that a drain valve malfunction on a paper machine created a sink hole an employee fell into. One willful serious and one serious violation, $77,800 fine.
    • Employer exposed workers to hazards from the heat of large amounts of spilled pulp and the danger that the worker could be submerged in the pulp. They also did not have a safety program for the piping system, as required.
  • Issued Nov. 20, 2026 (view inspection results): In response to the May 26 tank rupture that killed 11 workers and injured 12 others. 64 Egregious Willful Serious violations; 6 Willful Serious violations; and 5 Serious violations, $9,177,127 fine.
    • Investigators found the company continued operating the tank despite knowing its walls were dangerously thin. They also identified safety violations involving other chemical storage tanks and the company's emergency planning, training, and response.
  • Opened June 12, 2026: For observed and reported hazards not related to the May 26, 2026, tank failure.
  • Opened July 16, 2026: Inspection ongoing in response to incident involving employee hospitalization.
    • Employee was operating a forklift and handling a tote with sulfuric acid when the incident occurred.

Complaints handled without inspections

  • Complaint received May 20, 2020
    • Hazard description: Complainant questioned qualifications for some managers running equipment.
    • Employer response: The managers in question had extensive previous experience and are responsible for certifying employees to work with the machinery in question.
    • L&I determination: No further action was required.
  • Complaint received June 10, 2020
    • Hazard description: Bolts sticking out of the ground which created a tripping hazard. Gaping holes in the floor and employees using narrow unsteady walkways.
    • Employer response: There was work being done in the area in question where a hole had to be opened up. Temporary guard rails and floor hole coverings were put in place to protect employees in the area while the problem was being fixed. Pictures were provided as evidence.
    • L&I determination: No further action was required.
  • Complaint received Jan. 20, 2021
    • Hazard description: COVID-19 precautions not being enforced with workers not wearing masks unless management comes around.
    • Employer response: Employer provided copies of their COVID-19 requirements and postings available to their employees about actions needed for the pandemic. Supervisors also were required to fill out checklists on each shift that reinforced the use of masks. A cleaning service was hired to clean gathering areas and the employer provided personal protective equipment (PPE).
    • L&I determination: No further action was required.

Safety and health retaliation investigation

L&I investigates complaints of retaliation against workers for exercising their workplace safety and health rights.

  • Complaint received Aug. 28, 2023
    • Complainant alleged his firing was motivated, in part, because he raised safety concerns related to recurring crane malfunctions that he believed created a hazard. The safety and health retaliation complaint was not filed within the 90-day required time limit under the law. L&I conducted a review, including a follow-up with the complainant, but did not find evidence to excuse the missed filing deadline.
BOILER & ELECTRICAL PROGRAMS

Boiler program

The tank involved in the Nippon Dynawave incident was not a boiler or pressurized storage tank; however, there are 303 objects at the Longview site that are covered by L&I's Boiler program, with inspections and certification for those objects generally every 2 years.

Over the past 5 years, there have been more than 720 inspections of these at the site.

All inspections are up to date — there are minor open items noted related to worn nameplates on machines.

L&I does not inspect boilers and other pressurized storage tanks at the Longview site. L&I oversees the certification of the roughly 140 certified inspectors who perform most boiler inspections statewide (13 work for L&I, while the rest work for third parties).

At the Longview site, on-site work has been performed primarily by Factory Mutual Insurance Company (“FM” or previously “FM Global” (UBI 601-129-183)) with 3 tanks inspected by Arise Boiler Inspection & Insurance (UBI 602-922-420).

In general, for third-party inspections:

  • Inspections are done by the certified inspectors who submit reports to L&I
  • L&I reviews the data on the reports

Electrical program

The Electrical program has not had any recorded work on, around, or related to the tank that failed in the last 5 years.

There have been 160 electrical inspections at the site over the past 5 years. There are 4 open electrical permits at the site. There were no pending corrections at the time of the incident.

Electrical inspections happen on this site in one of 2 ways: An electrical contractor requests inspection for installation, or the owner/contractor has an annual maintenance permit that has scheduled inspections every month.

Both types of inspections happen the same way at this location:

  • Meet the representative at the access gate, ensure required personnel protective equipment is in place (PPE), and if required, have a safety briefing for the inspection area.
  • Go to the inspection area or review the maintenance list; inspect requested items to RCW 19.28, WAC 296.46B, and the National Electric Code.
  • Review corrections, if any, with the electrical representative, and go back to the gate.
  • Enter inspection results into the L&I inspection database.
  • Notify the contractor or owner on the same day.
ELEVATOR PROGRAM

Elevator program

The Elevator program has not had any recent recorded work on, around, or related to the tank that failed in the last 5 years.

The firm does have conveyances covered by this program at the site. There have been 59 inspections of conveyances over the past 5 years. No outstanding issues were noted.

In general, Elevator program inspections happen on this site in one of 2 ways: An elevator contractor requests an inspection for an installation, alteration, or conveyance accident investigation, or the owner has an annual operating permit that has scheduled inspections every year.

Both types of inspections happen the same way at this location:

  • Meet the representative at the access gate, ensure required personnel protective equipment is in place (PPE), and if required, have a safety briefing for the inspection area.
  • Go to the inspection area or review the maintenance list; inspect requested items to RCW 70.87, WAC 296.96, and the National Electric Code.
  • Review corrections, if any, with the elevator representative, and go back to the gate.
  • Enter inspection results into the L&I inspection database.
  • Notify the contractor or owner on the same day.
WORKER PAY & RIGHTS

Employment Standards program

There have been 17 wage complaints involving this worksite filed at L&I over the past 5 years, and a total of 71 over the past 10 years.

Most of these center around meal and rest breaks. There have been no citations or Determinations of Compliance issued.

The last wage complaint was filed Sept. 24, 2024, and all complaints have been resolved.

Employment Standards complaints
Year Amount
2026 0
2025 0
2024 2
2023 4
2022 0
2021 11
2020 35
2019 6
2018 10
2017 3
2016 0

L&I News Releases

Useful Resources